A.

Maximum capacity income per hour for one player:

$10.00 per 10 minute game
6 cycles per hour
$60.00 per player per hour
B. Full operational capacity assuming 5 minutes between cycles (15 minutes per cycle; 4 cycles per hour) $10.00 per player or $40.00 per hour
C. Sixteen players operating at full operational capacity $10.00 per player - $640.00 per hour
D. Operating on a 12 hour day (12:00 p.m. to 12:00 a.m. gross) At $640.00 per hour - $7,680.00 per day
E. Gross yearly income at $10.00 per game  

 

PRIME MONTHS 3 SUMMER MONTHS 4 OFF MONTHS  
% of Full Operational Capacity Day Month* 25 Days 3 Month Total Month 4 Months 7 Month Year Total Net Profits Before Taxes
10% $476.16 $11,904.00 $35,712.00 $2,976.00 $11,904.00 $47,616.00 $1,500.00
15% 753.30 18,832.50 56,496.00 4,708.00 18,832.00 71,424.00 17,000.00
20% 952.32 23,808.00 71,424.00 5,952.00 23,808.00 95,232.00 34,000.00
25% 1,190.40 29,760.00 89,280.00 7,440.00 29,760.00 119,040.00 42,000.00
30% 1,428.48 35,712.00 107,136.00 8,928.00 35,712.00 142,600.00 55,000.00
35% 1,666.56 41,664.00 124,992.00 10,416.00 41,664.00 166,656.00 65,000.00

*Note: Allows for 5 rain days per month

 

Pursuit Park Total Construction Cost
Approximations (Not a Quote)

Silver Field: 50'X100'
From Amusement Products
20 Gun Equipment Package $21,400.00
Silver Field Net Package (No Top) $6,000.00
Slide Collar and Winch Assemblies (2) $2,390.00
Silver Field Bunker Package $7,995.00
Equipment Total $37,785.00
Construction Silver Field
Grading (Depends on Current Conditions) $4,000.00
Poles (Steel) $5,500.00
Six Light Poles (@ 1000 Watts Per Pole) $ 6,000.00
Gravel $3,500.00
Field Prep Material $1,500.00
Labor (4 Men for Two Weeks) $7,000.00
Paint Sales and Storage Building (10'X20') $12,500.00
Construction Total $40,000.00
Grand Total $77,785.00

Gold Field: 75'X150'
From Amusement Products
20 Gun Package $21,400.00
Gold Field Net Package (No Top) $8,225.00
Slide Collar and Winch Assemblies (2) $2,390.00
Bunkers for Gold Field $9,990.00
Equipment Total $42,005.00
Construction
Grading (Depends on the Existing Conditions) $5,000.00
Poles (Steel) $7,500.00
Eight Light Poles (@ 1000 Watts Per Pole) $8,000.00
Gravel $6,000.00
Field Prep Material $3,000.00
Labor (4 Men for Two Weeks) $12,500.00
Paint Storage and Sales Building $12,500.00
Construction Total $54,500.00
Grand Total $96,505.00

Amusement Contractors will build the Silver size field on your site for $54,500 and the Gold size field for $67,500. This does not include the rough grade, the electrical work or the equipment supplied by Amusement Products.